Making Good

Making Good at PRNS

Making Good involves the final touches and refinements that bring a construction project to completion. It includes a range of tasks including plastering, joinery, decoration, and flooring. At PRNS these elements are essential for ensuring that the space surrounding a lift installation or renovation is not only functional but also visually appealing.

Since 2009, PRNS Building Services has been delivering Making Good services to a high standard across the UK. With our dedicated finishing team, comprised of specialists in joinery, tiling, flooring, painting, plastering, and decoration, we ensure that every project is completed with precision and professionalism.

Whether it’s creating custom joinery pieces, laying the flooring, or applying the perfect coat of paint, our team executes each task with meticulous attention to detail. We understand the importance of Making Good in elevating the overall quality of a project, and we take pride in delivering exceptional results that exceed our client’s expectations.

Making Good

Our Making Good service ensures that every detail in your project is meticulously attended to for a polished final result.

plastering wall for lifts and escalators at PRNS as part of the making good service

Part of our making good process we provide the lift industry plastering. PRNS Building Services cover all aspects of plastering, including floating, skimming, drywall/dot and dabbing. 

lift joinery as part of the making good service at PRNS building services

Joinery is an essential part of any making good project. This part of our service includes but not limited to skirting boards and dado rails which our operatives complete to a high PRNS standard.

lift decoration as part of the making good service from PRNS building services

PRNS Building Services know the importance of a professional finish. We take great care on our decoration to ensure we fulfil the client’s needs on our projects.  You can be assured that our operatives have a wealth of experience in this sector.

lift flooring at PRNS building services as part of our making good service

For this sector of making good our skilled operatives are professionals at installing flooring. This includes carpet, tiles or vinyl flooring which we would ensure that our finishing team would complete to a high standard.

During the planning phase or a site survey we would take accurate measurements to ensure that there will be no complications further into the project.

Why Choose PRNS for Your Platform Lift Project?

With 15 years of expertise in the lift and escalator industry, PRNS Building Services guarantees the accuracy and success of every project we undertake. Our Making Good service demonstrates our commitment to excellence, providing meticulous attention to detail and unmatched quality.

Our experienced team, with over 100 years of combined specialised experience, ensures that every aspect of your project is completed to the highest standard. From joinery to tiling, flooring to painting, plastering to decoration, we deliver exceptional results that exceed expectations with our Making Good service.

Ready for a job well done?

Contact us now to discuss your needs and request a quote. 

CASE STUDIES

Making Good at OSBORNE COURT

Our team fitted three temporary hoardings to all the lift entrances to allow safe access and safe conditions for all operatives whilst working on the Osborne Court site in St Helens. Health and Safety signage were also visibly displayed on all three of the onsite hoardings. Once the lift beam was tested and the scaffold was in place our team began the making good process.

For this site our finishing team fitted new flooring, joinery and professionally decorated as part of the making good service at PRNS.

Making good at BOURTON-ON-THE-WATER

Our team at the Bourton-on-the-Water PRNS Building built a 1000kg passenger lift for Allied Lifts. This process started with the removal of the concrete floor slab before the pit excavation began. We then installed the reinforced steels and poured the concrete to form the pit floor. Our team then accurately installed all the timber shutters and poured the concrete into all necessary areas. This was followed with the cutting of the apertures and building the shaft through the roof line. Once the scaffold was in place, we completed the lift shaft with a traditional flat roof. On our next visit we painted the lift pit and our finishing team began with the making good process.

For the this process we started with fitting the plasterboards around the lift entrances followed by professional plastering as showcased in our before & after site imagery below. Our team then painted and finished the lift entrances to a high PRNS standard.

making good at PREMIER INN, NEWCASTLE

The PRNS team at the Premier Inn in Newcastle supplied and installed temporary hoardings on the first floor and boarded off the gate at lower level. Once the platform lift was installed by our client, we began making good.

For this process our onsite operatives made good around the control panels and the entrances at the Premier Inn site. We then finished by safely removing the door at ground level.

making good at Boots DartFORD

The team at PRNS supplied and installed four bespoke temporary hoardings at the Boots site in Dartford. Our operatives then carried out the decoration and refurbishment to the site. This included supplying of the chequer plate corners, threshold fire line all entrances shaft side, setback boxes for pushes and indicators.

On our final visit we completed making good to all entrances. this included plastering, joinery and flooring. Please note this project is the removal of the goods lift converted into a passenger lift