Dock Leveller Pit Construction At PRNS.
At PRNS, we specialise in Dock Leveller pit construction, providing efficient and effective repairs for sites across the country.
The construction of the pit involves various steps, including excavation, installation of support structures, pouring concrete, and finishing. The goal is to create a secure and stable foundation for the dock leveller, ensuring smooth and safe loading and unloading operations at a commercial or industrial facility.
Proper construction of the dock leveller pit is essential for maintaining the structural integrity of the loading dock area and preventing accidents or damage during use.

Our Dock Leveller Construction Process:
1.
Secure Working Area.
Once our team arrives on-site, we set up a secure working area. Health and safety are paramount in the smooth running of any project, a safe working environment being crucial for our team and anyone on-site at the time of the works.
2.
Damaged Concrete.
3.
Timber Shuttering.
4.
Concrete Pour.
We then proceed to pour the concrete to ensure there is no honeycombing we use a 110v vibrator. This supports the concrete having a smooth finish once the shutters are removed.
5.
Removal.
Finally, the timber shutters are carefully removed by our team, leaving the final product.
6.
Clean Down.
As always, our teams will then clean the working environment down and remove everything from the site before departure.