Cutting Out Entrances to serve all floors.
There is a strict process that we follow to ensure the safety and accuracy within our ventilation methods, which are undertaken on every High-Rise job that we complete:
- Inspection of project and RAMS from Supervision.
- Installation of Power clad between the lift shafts to prevent damage and the cover up all gaps segregating the shafts to protect against dust and water exposure.
- Setting up enclosed area.
- Attach mobile Dustmaster which contains EPI-Filters and holds all the dust within the unit.
- Display visible hazard tape to all corners.
- Commence track sawing.
- Sites clean down.
Full Turnkey Solution.
Our Full Turnkey Solution can be utilised – providing all your building needs in one safe place – allowing ease and peace of mind for Project Managers involved. Whatever your enquiry for specialists’ builders work – we can cater to your needs.
This will include all of the following services:
- Temporary Hoardings (Timber/ Steel/ Fire Rated).
- Lifting beams/ Eyes.
- Container Hire.
- Pit Excavation.
- Pit Waterproofing.
- Concrete Entrances Opened Up.
- Ventilation Methods.
- Electrics.
- Scaffolding.
- Cutting Out Apertures.
- Making good to Lift Entrances.
- Removal of Passenger Lift.
- Building a new Lift Shaft.
- Core Drilling.
- Lining Lift Car.
- Access Hatches.
- Decoration of Motor Room.
- Decoration of Lift Shaft.
Our Projects:
Essex Tower.
Brook House.
Derby House.
Woodcock House.
Douglas House.
Parkway Towers.
Contact us
Request a call back by filling in this form.