Farnham Road
Our team have installed a waterproof membrane along with rebar and poured concrete for the concrete slab.
We then installed shuttering and poured concrete around to form the walls of the lift pit.
Here at PRNS we are always looking for your feedback so please do not hesitate in getting in touch.