Check out Our Company Summary for 2024.
Experienced & skilled tradesmen operating across the UK, from Northern Scotland to South Coast of England.
Read firsthand how our services have made a difference:
Really helpful lads.
Worked with PRNS for a long time now, and they always deliver a good service.
From start to finish their projects go to plan. Hoardings are on point, to spec and delivered within the deadline. Attention to detail, taking in to account all other aspects of building services and pedestrian flow to allow for a seamless interface with the needs of the customer outside of the designated work area.
As a regular customer of PRNS, I find them to be hard working and reliable by offering the level of commitment, quality and professionalism our customers expect.
PRNS installed herris fencing around the new pallet lift area to segregate Newell Brands staff and keep the work area safe for PRNS and site, we then excavated a pallet lift pit with a digger and mini dumper to remove spoil into skips onsite (all to structural drawings).
We then installed visqueen and A393 rebar to prepare for the c35 concrete pouring of the dock leveller base and upstand walls. Once concrete had cured any shuttering was removed and hoarding also removed .
PRNS installed large timber hoarding inside with double doors to keep the correct temperature for the refrigerated factory internally and herris fencing to the live store to segregate Oaklands staff and keep the work area safe for PRNS and site, we then excavated 2 dock leveller bays with a digger and mini dumper to remove spoil into skips onsite (all to structural drawings)
We then installed visqueen and A393 rebar to prepare for the c35 concrete pouring of the dock leveller base and upstand walls over the 2 bays at the same time. Once concrete had cured any shuttering and hoardings were removed to leave a clean site ready for the new dock leveller installations .
PRNS installed large timber hoarding inside with double doors to keep the correct temperature for the refrigerated factory internally and herris fencing to the live store to segregate Oaklands staff and keep the work area safe for PRNS and site, we then excavated 2 dock leveller bays with a digger and mini dumper to remove spoil into skips onsite (all to structural drawings)
We then installed visqueen and A393 rebar to prepare for the c35 concrete pouring of the dock leveller base and upstand walls over the 2 bays at the same time. Once concrete had cured any shuttering and hoardings were removed to leave a clean site ready for the new dock leveller installations .